Team Leader of Study & Engineering Include Aerial Survey of Bekasap – ou Infield Drainage System Riau, PT. Chevron Pasific Indonesia. April 2005 – April 2006 (12 months)
Team leader of Community Development Program on Agriculture, Animal Husbandry and Fishery, Mimika Papua. PT. Freeport Indonesia. Oct 2003 – Mei 2004 (8 months)
Hydraulic Engineer of Study on Profile of Swamp Irrigation in South Kalimantan Province. South Kalimantan Irrigation and Swamp Project. April 2003 – October 2003 (6 months)
Team Leader of Structural Analysis of Bridges of Pertamina UP-V Balikpapan East Kalimantan. Dec 2002 – Feb 2003 (3 months)
Senior Hydraulic Engineer of Detail Engineering Design Service for Duri Drainage and Canal Improvement Project. PT. CALTEX PACIFIC INDONESIA. Riau Province. Oct. 2001 – March 2002 (6 months)
Team Leader of Review of the Detail Design of Tertiary Canal Network of “Million Hectare Swamp Development Project”. Central Kalimantan Province. August 1999 – Jan 2000 (6 months)
International Specialist (FAO – UN) for Waterlogged Lowland Development, Demonstration of Low Cost Irrigation for TCP Project in Kenya Africa, June 1999 – July 1999 and Jan 1999 – Feb 1999 (2 months)
Hydraulic Engineer of Fact Finding Survey in Integrated Swamp Development Project (ISDP) in West Kalimantan, Riau and Jambi Provinces. Directorate General of Water Resources, Ministry of Public Work, Funded by World Bank. May 1999 – August 1999 (4 months)
Hydraulic Engineer for Design of Land Development in Lamunti, Dadahup and Palangkau (20,000 ha) “One Million Hectare Swamp Development Project”. Central Kalimantan Province. Directorate General of Water Resources, Ministry of Public Work, July 1998 – March 1999 ( 8 months).
Team Leader for Field Test and Monitoring of Water Management System in Lamunti (10,000 ha) ” One Million Hectare Swamp Development Project”. Central Kalimantan Province. Directorate General of Water Resources, Ministry of Public Work, July 1997 – March 1998 ( 8 months)
Hydraulic Engineer/Team Leader for Detail Design of Integrated Swamp Development Project in Kapuas Kecil II & III (6700 ha), Pontianak, West Kalimantan. Directorate General of Water Resources, Ministry of Public Work, Funded by World Bank. October 1995 – April 1996 (6 months)
Hydraulic Engineer/Team Leader for Detail Design of Improvement of Irrigation System in Sebangkau Swampy Area (200 ha), Sambas, West Kalimantan. Directorate of Swamp, Directorate General of Water Resources, Ministry of Public Work. August 1994 – April 1995 (8 months)
Hydraulic Engineer/Team Leader for Engineering Design & Water Management Study SBADP (Second Brackish Aquaculture Development Project) Bagan Kuala, Deli Serdang, North Sumatera. Directorate of Swamp, Directorate General of Water Resources, Ministry of Public Work. Funded by ADB, Sept 1993 – March 1994 (7 months)
Hydraulic Engineer/Team Leader for Study on Siltation at Intake of Tanjung Priok Combined Cycle Power. Funded by PT. PP Taisei Indonesia Construction, PT. Pembangunan Perumahan Joint Operation, July 1993 – Sept 1993 (3 months)
Hydraulic Engineer/Team Leader for Study on the Extension of Intake of Circulating Cooling Water System Muara Karang Steam Power Plant. Funded by PT. PLN (Persero) – PPE, March 1993 – June 1993 (4 months)
Hydraulic Engineer/Team Leader for Study on Sedimentation of mahakam River for the intake of Samarinda Steam and Gas Power Plant. Funded by PT. PLN (Persero) – PPE, October 1992 – March 1993 (6 months).
Hydraulic Engineer/Team Leader for Detail Design of Shrimp Pond Irrigation System in Lainea, Kendari, South East Sulawesi. Directorate General of Fisheris, Ministry of Agriculture, June 1992 – Sept 1992 (4 months)
Hydraulic Engineer/Team Leader for Oceanography and Hydrology Survey of Muara Karang Steam Power Plant. Funded by PT. PLN 9Persero) – PPE, February 1992 – May 1993 (4 months)
Hydraulic Engineer/Team Leader for Detail Design of Fish Pond Irrigation system Improvement Juwono, Central of Java. Directorate of Swamp, Directorate General of Water Resources, Ministry of Public Work. July 1991 – February 1992 (7 months)
Hydraulic Engineer/Team Leader for Hydraulic and Sediment Transport Study of Belawan River for the Intake of Circulating Cooling Water Belawan Steam Power Plant. Funded by PT. PLN (Persero) – PPE. March 1991 – June 1991(4 months)
Hydraulic Engineer/Team Leader for Detail Design Improvement of Tambak Water Supply Pinrang and Barru, South Sulawesi. Directorate General of Fisheris, Ministry of Agriculture. Dec 1989 – Nov 1990 (5 months)
Hydraulic Engineer for The Improvement of Tukad Buleleng River Mouth, Singaraja Bali, PPPS Bali. August 1989 – Dec 1989 (5 months)
Hydraulic Engineer/Team Leader for Detail Design of Improvement of Tidal Irrigation System in Teluk Batang I/4 and I/5, Teluk Batang, West Kalimantan. Directorate of Swamp, Directorate General of Water Resources, Ministry of Publik Work. March 1989 – July 1989 (5 months)
Hydraulic Engineer/Team Leader for Detail Design of Special Maintanance of Tidal Irrigation System in Sugihan Kiri Jalur 16, South Sumatra. Directorate of Swamp, Directorate General of Water Resources, Ministry of Public Work. March 1988 – Oct 1988 (8 months)
Mathematical Model Engineer for Study of the Protection of Jakarta Bay (Second Stage). DPU DKI Jakarta. Sept 1987 – March 1988 (6 months)
Mathematical Model Engineer for Study of the Protection of Jakarta bay (first Stage) DPU, DKI Jakarta. Jan 1987 – July 1987 (6 months)
Mathematical Model Eng./Research Engineer for Study of Water Quantity Aspects of Kolam System for the Symposium of Lowland Development Barambai South Kalimantan Province. March 1986 – Sept 1986 (6 months)
Mathematical Model Engineer for Study of Salt Intrusion in Juana River, Juana Central Jawa, Jratunseluna Project. Oct 1985 – Feb 1986 (5 months)
Mathematical Model Eng./Hydraulic Engineer for Enginering Design Service for Tidal Swamp Land Development Project, Central Kalimantan Province Directorate of Swamp, Directorate General of Water Resources, Ministry of Public Work. March 1986 – Sept 1986 (6 months)
selamet siang P budi, kami dari perusahaan perkebunan sawit (BGA group). Kami ada rencana buat water manajemen system di salah satu kebun kami di Kalteng, dikarenakan banjir yg meyebabkan kebun terendam, dan sebagian area tergenang tidak bisa di buka. (luas terendam +/- 2500 Ha)
salam kenal saya Fidha dari tim Bengkeldata.com, yang sedang mengadakan reasearch kepada teknik ahli. Dengan ini mau menanyakan ke mas budi, kira2 sertifikasi tekhnik apa saja yang telah mas budi miliki?
it’s great..
Oleh: mietha on April 19, 2008
at 10:35 am
mari kita jadi manusia rawa swamp think
Oleh: Robert Chandrawidjaja on Agustus 28, 2008
at 8:02 am
impian saya kuliah di teknik sipil adalah menjadi “orang Hidro-Lingkungan”…
Oleh: asih abdurrahman on Agustus 30, 2008
at 1:07 am
ass.wr.wb
keren abiz..
Oleh: Aguz on September 18, 2008
at 10:52 am
Yth P Budi,.
selamet siang P budi, kami dari perusahaan perkebunan sawit (BGA group). Kami ada rencana buat water manajemen system di salah satu kebun kami di Kalteng, dikarenakan banjir yg meyebabkan kebun terendam, dan sebagian area tergenang tidak bisa di buka. (luas terendam +/- 2500 Ha)
Apakah Bp bisa bantu kami
Tks
Hk
Yudi herwanto
Oleh: Yudi Herwanto on Maret 23, 2009
at 1:22 pm
Kalau memungkinkan, dengan senang hati kami akan bantu.
Oleh: Budi Wignyosukarto on April 5, 2009
at 7:55 am
dear mas budi,
salam kenal saya Fidha dari tim Bengkeldata.com, yang sedang mengadakan reasearch kepada teknik ahli. Dengan ini mau menanyakan ke mas budi, kira2 sertifikasi tekhnik apa saja yang telah mas budi miliki?
terim kasih sebelumnya
fidha
Oleh: fidha on Juli 13, 2009
at 9:51 am